Wednesday, 23 September 2015

Timeline, Things to do, Installation

Week 3

-Installation prototype testing around university. (Friday)
-Pick the final design concepts (installation)
-Design installation packaging (to give to shops for them to put up, Ravi and Stephanie)
-Design logo concepts (possibly with all of Mr Foureyes group)
-Guide: what to post and what not to post online e.g. Facebook, Twitter
-Take photos of locations
-Design glasses that suit your locations

Week 4

-Find out information for installation. Where can Ravi and Stephanie get the materials? How will they get it laser cut? Costs?
-Deciding on the final logo (Tally?)


Things to do:

Installation - Design the frames, laser cut, source materials, find out locations and seasons, hashtag, journey map, Wellington theme, relating to location they are in?
Logo - 2 idea concepts
Social Media - How to, hashtag
Packaging (for installation) - Design simple concepts, prototype
Stickers?


Location for Installation (Wellington theme) 

Hidden areas? (Letting people discover hidden stores around Wellington). Treasure hunt

Talia 
Mount Vic 
Oriental Bay/waterfront (park, trees)
-Frankitts

Rebecca 
Cuba (trees, shop signs, umbrella, bus stops)
Left bank (zig zag, stairs, suspension)

Jasmin 
Park next to Kirks
Wellington station (underground, windows)

Gin
-Civic square (library: people who needs reading glasses) 


No comments:

Post a Comment